The strongback is the backbone of this operation. The molds are attached to it and the canoe is built on the molds. It is 170" long and 12" wide and about 28'' high. It is constructed of 3/4" plywood.
This is the underside of the strongback.
It is crucial that the strongback be level end to end and side to side. Once it was leveled with shims, it was attached to the concrete floor with Tapcon screws.
Sunday, January 18, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment